#WT: Production Status Updates
Please read below.
.
Sign up or login using Facebook to get started on Quirky right now!
I have read and understood Quirky's Terms & Conditions
In order to invent, influence, and earn, you first have to register for a Quirky account. Don’t worry… it’s super quick and easy.
In order to invent, influence, and earn, you first have to register for a Quirky account. Don’t worry… it’s super quick and easy.
Skip registration and participate now by logging in with Facebook!
I have read and understood quirky's terms & conditions
Community / Forum / Quirky Products / #WT: Production Status Updates
Discuss products already in the shop or currently in development
.
This is a wikithread, meaning the next comment below will routinely be updated with relevant info related to the title topic. All helpful comments and updates posted in this thread will also be added.
.
All Wikithreads can easily be found by searching for #WT in the search box.
Ventu: testing various tolerances of the arm to create a tight seal. (11/02 blog post)
.
Unhampered: awaiting a new prototype (with revised design) from factory (6/29 blog post)
.
Boil Buoy: in engineering, with focus on electronics, mechanism, and safety issues (6/29 blog post)
.
Kosuku: getting tooled (6/29 blog post). We still don't have an exact date, but we're expecting Kosoku in time for the holiday season. I'll post more updates when I have them. (Nov GS Post)
.
Mocubo: in Tooling/Prototype/Materials/Quoting (11/15 thread). Three drawers moved to the front; strainer removed.
.
Steeper Keeper: just entered production (11/11 blog post)
.
Stake: prototyped, with ETA early next year (ideator report).
.
Mercado: just entered production (12/5; blog post)
.
Totem: just entered production (11/29; blog post)
.
Ember: It is currently in the prototyping stage, which means the engineering is solid & they are basically inspecting prototypes from the factory & making the necessary adjustments. They are being made at the same plant that manufactures Pivot Power--which is good news to me, because I really like the quality of the Pivot Power. Once they have approved a prototype from the manufacturer, they will need to perform electrical testing/inspections. It takes roughly a month between each prototype that is reviewed (12/7: ideator report, this thread).
.
Also in production:
.
Flair
HydraDuo
Ripple
Bloom
Ledge
Cush
Sliders
Ember
Iron Station
Pen Zen
Brim
Porter
Mirage
Scribe
Nautilus
Sling Back
Stash Can
Go Caddy
Splash Stacks
.
Feel free to request specific updates for certain products (in production, not design) below, and the Inventions Ambassadors will work to find us the latest update.
Stake is almost there, saw the prototype and it looks great! Should be ready by early next year...
Matt is getting as sloppy as QS. He's defected to the dark side! :P
Oops...sorry guys. I was typing too literally. Yes, sloppy and rushed. I need to practice what I preach and slow down :)
Also, Lift is in production? It doesn't have the "We're Making this" on it.
@Tyrel: you are welcome. Trying to figure out how to make myself useful :)
.
@Cody: another nice catch! Not sure how it got there. It has been removed.
© Copyright 2009 – 2012 Quirky Incorporated – Made in NYC

